Project's Executed

PASSENGER ROPEWAYS EXECUTED IN INDIA & GLOBALLY


ANDHRA PRADESH : 

01. SRISAILAM TEMPLE ROPEWAY PROJECT - THE FIRST TEMPLE ROPEWAY IN INDIA DEDICATED TO LORD SHIVA 

700 M LONG, MONOCABLE PULSATED FIXED GRIP SYSTEM, 400 PPH CAPACITY, DESIGNED & BUILT IN 2005.


BIHAR : 

01.RAJGIR CHAIRLIFT ROPEWAY PROJECT

305 M LONG, SINGLE CHAIR CAR SYSTEM, 250 PPH CAPACITY, DESIGNED BY BRECO LONDON & EXECUTED BY SHRI S.N.LALL IN 1968.


GUJARAT : 

01.SAPUTARA ROPEWAY PROJECT - ONE AND ONLY HILL STATION OF GUJARAT

920 M LONG, HILL TO HILL WITHOUT SUPPORT, MONOCABLE PULSATED FIXED GRIP SYSTEM, 400 PPH CAPACITY, DESIGNED & BUILT IN 1991. 


02.MAA AMBA DEVI ROPEWAY PROJECT - 363 M LONG, MONOCABLE DETACHABLE, SYSTEM, 800 PPH CAPACITY, EXECUTED & COMMISSIONED FOR UBL IN 1998. 


HIMACHAL PRADESH : 

01.JAKHU TEMPLE ROPEWAY PROJECT - THE FIRST ROPEWAY OF SHIMLA CITY

410 M LONG, MONOCABLE JIG BACK SYSTEM, 600 PPH CAPACITY, DESIGNED & BUILT IN 2017.


02. PARWANOO ROPEWAY PROJECT - THE FIRST ROPEWAY OF HIMACHAL PRADESH

1800 M LONG, HILL TO HILL WITHOUT SUPPORT, BI CABLE ZIG BACK CABLE CAR SYSTEM, 1000 PPH CAPACITY, DESIGNED & BUILT IN 1988. 


MAHARASHTRA : 

01.RAIGAD ROPEWAY PROJECT - DESIGNED BY AARCONINFRA ROPEWAYS AND PROJECT EXECUTED BY CLIENT.

760 M LONG, MONOCABLE PULSATED FIXED GRIP SYSTEM, 600 PPH CAPACITY, DESIGNED IN 1996.


ODISHA : 

01.NANDANKANAN ROPEWAY PROJECT - THE FIRST ZOO ROPEWAY OF ODISHA AND INDIA

628 M LONG, MONOCABLE PULSATED FIXED GRIP SYSTEM, 400 PPH CAPACITY, DESIGNED & BUILT IN 1989. 


TELANGANA : 

01.OCEAN PARK ROPEWAY PROJECT - THE FIRST AMUSEMENT PARK ROPEWAY OF HYDERABAD AS WELL AS OF TELANGANA & ANDHRA PRADESH.

350 M LONG, MONO CABLE PULSATED FIXED GRIP SYSTEM, 400 PPH CAPACITY, DESIGNED & BUILT IN 1995. 


UTTARAKHAND : 

01.MANSA DEVI ROPEWAY PROJECT - THE FIRST GONDOLA ROPEWAY OF INDIA

540 M LONG, MONOCABLE DETACHABLE SYSTEM, 800 PPH CAPACITY, EXECUTED & COMMISSIONED FOR UBL IN 1981.


02.CHANDI DEVI ROPEWAY PROJECT - 740 M LONG, MONO CABLE DETACHABLE SYSTEM, 800 PPH CAPACITY,EXECUTED & COMMISSIONED FOR UBL IN 1991.


03.JOSHIMATH ROPEWAY PROJECT - ASIA'S HIGHEST & LONGEST BI CABLE JIG BACK ROPEWAY LOCATED AT AN ALTITUDE OF 3010 M ABOVE SEA LEVEL IN THE MOST DIFFICULT TERRAIN & WEATHER CONDITIONS.

4200 M LONG, BI CABLE JIG BACK CABLE CAR SYSTEM, 1000 PPH CAPACITY, DESIGNED & BUILT FOR TRIVENI STRUCTURES LTD IN 1987.


04.MUSSOORIE ROPEWAY PROJECT - THE FIRST & THE OLDEST BI CABLE ROPEWAY OF INDIA

400 M LONG, BI CABLE ZIG BACK CABLE CAR SYSTEM, 800 PPH CAPACITY, DESIGNED & EXECUTED IN 1970.


05.NAINITAL ROPEWAY PROJECT - 2270 M LONG,BI CABLE ZIG BACK CABLE CAR SYSTEM, 1200 PPH CAPACITY, DESIGNED & BUILT FOR TRIVENI STRUCTURES LTD  IN 1990.


06.GRAVITY ROPEWAYS ALL OVER UTTARAKHAND FOR RURAL DEVELOPMENT FOR GMVNL (GARHWAL MANDAL VIKAS NIGAM LTD) 

200 TO 600 M LONG VARIOUS KIND OF GRAVITY BASED ROPEWAYS WITH MANUAL WINCH SYSTEM AND AUTOMATED SPECIALLY FOR LOCAL FARMERS IN HILLY TERRAIN. 


WEST BENGAL : 

01.DARJEELING ROPEWAY PROJECTS - SPECIALLY DESIGNED TWO ROPEWAYS TO CARRY FRESH TEA LEAVES FROM TEA GARDENS OF GOODRICKE TEA COMPANY TO THEIR PROCESSING PLANT AREA IN DARJEELING.

250 M & 350 M LONG. MONO CABLE FIXED GRIP SYSTEMS, DESIGNED & EXECUTED FROM 1985 TO 1987.


BHUTAN : 

01.PHAJODING MONASTERY ROPEWAY PROJECT - 980 M LONG,MONO CABLE FIXED GRIP SYSTEM, 400 PPH CAPACITY, DESIGNED & BUILT IN 2001. 



INDUSTRIAL ROPEWAYS EXECUTED IN INDIA & GLOBALLY - 


ANDHRA PRADESH : 

01. KCP MACHERLA  ROPEWAY PROJECT - KCP CEMENTS LIMITED

5.4 KM  LONG, MONOCABLE SYSTEM, 200 TPH CAPACITY CARRYING LIMESTONE, RE-DESIGNED & REVAMPED THE WHOLE SYSTEM IN 2017 AND DOING O&M ALSO FOR KCP CEMENTS. 

02. PANYAM CEMENT ROPEWAY PROJECT - PANYAM CEMENT AND MINERAL INDUSTRIES LIMITED.

4 KM LONG BI CABLE SYSTEM, 400 TPH CAPACITY CARRYING LIMESTONE, DESIGNED & BUILT IN 1986. 


ARUNACHAL PRADESH : 

01.OIL INDIA ROPEWAY PROJECT - OIL INDIA LIMITED.

700 M LONG, BI CABLE JIG BACK SYSTEM, 5-6 TPH CAPACITY CARRYING MAN & MATERIAL CROSSING RIVER, DESIGNED & BUILT IN 1975.


BIHAR - BENGAL : 

01.CHASNALA ROPEWAY PROJECT - INDIA'S FIRST LONGEST MATERIAL COAL TRANSPORTATION ROPEWAY & ASIA'S LONGEST INDUSTRIAL ROPEWAY WITH TOTAL LENGTH OF 56 KM FROM BIHAR CHASNALA TO BURNPUR  (INDIAN IRON STEEL COMPANY ), WEST BENGAL ASANSOL, CROSSING  2 STATES, HAVING TOTAL 11 TRANSIT STATIONS, BUILT FOR SIR  BIREN MUKHERJEE WHO WAS THE OWNER OF INDIAN IRON STEEL COMPANY, IN THE YEAR 1969. THEN DISMANTLED BY GOVT OF INDIA WHEN MINES WERE NATIONALIZED.

56 KM LONG, BI CABLE SYSTEM, 300 TPH CAPACITY CARRYING COAL DESIGNED BY PHB GERMANY AND EXECUTED BY SHRI S.N. LALL IN 1969.


HIMACHAL PRADESH : 

01.CHAMERA DAM ROPEWAY PROJECT - JAYPEE GROUP.

2.5 KM LONG, BI CABLE SYSTEM, 300 TPH CAPACITY CARRYING DAM CONSTRUCTION MATERIAL, DESIGNED & BUILT IN 1976. 


JHARKHAND : 

01.TATA STEEL PLANT ROPEWAY PROJECT - TISCO, GHATOTAND, HAZARIBAGH, BOKARO.

5.4 KM LONG, MONO CABLE SYSTEM, 300 TPH CAPACITY CARRYING COALl, DESIGNED & BUILT IN 1994.


KARNATAKA : 

01. DIAMOND CEMENT ROPEWAY PROJECT - BIRLA GROUP OF COMPANIES

14 KM LONG, MONO CABLE SYSTEM, 200 TPH CAPACITY CARRYING LIMESTONE, DESIGNED & BUILT IN  1973.


MAHARASHTRA : 

01.MANIKGARH CEMENT ROPEWAY PROJECT - BIRLA GROUP OF COMPANIES.

7.5 KM LONG, BI CABLE SYSTEM, 650 TPH CAPACITY, CARRYING LIMESTONE, DESIGNED & BUILT IN 1982. 


MADHYA PRADESH : 

01. DIAMOND CEMENT ROPEWAY PROJECT - BIRLA GROUP, NARSINGHGARH, DAMOH, ASIA’S LONGEST INDUSTRIAL ROPEWAY.

25 KM LONG, MONO CABLE SYSTEM, 200 TPH CAPACITY CARRYING LIMESTONE, DESIGNED & BUILT IN 1975.


RAJASTHAN : 

01. KHETRI ROPEWAY PROJECT - HINDUSTAN COPPER LIMITED. 

7 KM LONG, BI CABLE SYSTEM, 300 TPH CAPACITY CARRYING ORE, DESIGNED & BUILT IN 1987


TELANGANA : 

01. ACC CEMENT  ROPEWAY PROJECT -  ACC CEMENTS, MANCERIAL, LONGEST INDUSTRIAL ROPEWAY OF SOUTH INDIA.

16.5 KM LONG, MONO CABLE SYSTEM, 200 TPH CAPACITY CARRYING LIMESTONE, DESIGNED & BUILT IN 1981.

02. INDIAN CEMENT ROPEWAY PROJECT - INDIA CEMENTS LIMITED, MIRYALAGUDA.

4.5 KM LONG, BI CABLE SYSTEM, 250 TPH CAPACITY CARRYING LIMESTONE, DESIGNED & BUILT IN 1990.

03. HEAVY WATER  ROPEWAY PROJECT - HEAVY WATER PLANT, DEPT. OF ATOMIC ENERGY, GOVT. OF INDIA, MANUGURU, DIST: KHAMMAM, ASIA’S BIGGEST HEAVY WATER PLANT.

9.8 KM LONG, BI CABLE SYSTEM, 300 TPH CAPACITY CARRYING COAL, MAJOR CONTRACTOR FOR SPARES MAINTENANCE & CRITICAL COMPONENTS SUPPLIER FOR 20 YEARS.

04. SINGARENI ROPEWAY PROJECT - SINGARENI COLLIERIES, KOTHAGUDEM.

6 km LONG, MONO CABLE  SYSTEM, 150 TPH CAPACITY CARRYING SAND FOR MINE FILLING, DESIGNED & BUILT ORIGINALLY BY BRECO  (LONDON) IN 1953, AGAIN RE DESIGNED AND REVAMPED BY AARCONINFRA ROPEWAYS IN 1990.


UTTARAKHAND : 

01. IIT ROORKEE ROPEWAY PROJECTS -  ALTERNATE HYDRO ENERGY CENTRE, INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE.

ASSOCIATED WITH ALTERNATE HYDRO ENERGY CENTRE, INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE FOR PUTTING MAXIMUM NOS OF GRAVITY BASED ROPEWAYS ALL OVER UTTARAKHAND FOR RURAL DEVELOPMENT. 


BHUTAN : 

01. TARAYANA FOUNDATION ROPEWAY PROJECT - TARAYANA FOUNDATION, THIMPHU.

980 M LONG, GRAVITY GOODS ROPEWAY CARRYING PRODUCE OF THE VILLAGES IN & OUT BENEFITTING MORE THAN 400 HOUSEHOLDS THROUGH EASY TO USE, CHEAP AND ECO FRIENDLY TRANSPORT SYSTEM SPECIALLY DESIGNED & BUILT IN 2010.

02. HYDROPOWER ROPEWAY PROJECTS - DRUK GREEN POWER CORPORATION LIMITED.

a  5 KM LONG, MONO CABLE SYSTEM TO CARRY SAND & GRAVELS.

b  2 KM LONG, ZIG BACK SYSTEM TO CARRY HEAVY MACHINERIES

c  7 KM LONG, ZIG BACK SYSTEM TO CARRY CONSTRUCTION MATERIAL. 

    ALL DESIGNED & BUILT IN 2018 & 2019.


ETHIOPIA : 

01. ETHIOPIA ROPEWAY PROJECT - ETHIO CEMENT, ADDIS ABABA, ETHIOPIA, WORLD’S TOUGHEST MATERIAL CARRYING ROPEWAY.

5.25 KM LONG, BI CABLE SYSTEM, 200 TPH CAPACITY CARRYING LIMESTONE, TOUGHEST INCLINE LIFT OF 459.73 M.


IRAN :

01. CALCIMINE  ROPEWAY PROJECT - CALCIMINE MINING COMPANY, TEHRAN, IRAN'S TOUGHEST & LONGEST ROPEWAY.

19 KM LONG, MONO CABLE DETACHABLE SYSTEM, 200 TPH CAPACITY CARRYING ZINC & LEAD, BUILT IN 1978.


NEPAL : 

01. HETAUDA ROPEWAY PROJECT - HETAUDA CEMENT FACTORY.

11 KM LONG, BI CABLE SYSTEM, 150 TPH CAPACITY CARRYING LIMESTONE, DESIGNED & BUILT IN 1998.


02. UDAYAPUR  ROPEWAY PROJECT - UDAYAPUR CEMENT INDISTRIES LIMITED.

13.8 KM LONG, BI CABLE SYSTEM, 200 TPH CAPACITY CARRYING LIMESTONE, DESIGNED & BUILT IN 1993.


03. KALIGANDAKI  ROPEWAY PROJECT - KALIGANDAKI HYDROELECTRIC POWER PROJECT, NEPAL ELECTRICITY AUTHORITY.

5 KM LONG, BI CABLE SYSTEM, TO CARRY CONSTRUCTION MATERIAL & MACHINERIES, DESIGNED & BUILT IN 1997.


ZAMBIA : 

01. MCL ROPEWAY PROJECT - MAAMBA COLLIERIES LIMITED.

11.8 KM LONG, BI CABLE SYSTEM, 250 TPH CAPACITY CARRYING COAL, DESIGNED & BUILT ORIGINALLY BY PHB (WEST GERMAN COMPANY) IN 1971, AGAIN RE DESIGNED & REVAMPED BY AARCONINFRA ROPEWAYS IN 2008.